GTS-1524027 ACTIVE BUY

Supply Of Under Frame Complete For Vbs/ndtc/cb To Drg No A09 11001, Alt 'nil'. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.02. For Painting Note 1.2 Of Drg No (538)lwlrrm-1-1-116, Alt 'e' To Be Followed---- Special Condition : The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down.- Packing To Be As Per Icf/j&t/misc-2487, Alt 'b' "there Will Be Minor Modifications In Design. Frim Shall Obtain The Final Drawings Before Manufacturing". Details For Satge Inspection. A Raw Material Stage Ensure The Raw Material Used Usingportable Spectrometer B Jig Stage Assembly Of Front Part With Solebar. Assembly Of Modular Frame Arrangement. Weld Parameters To Be Checked & Recorded C Trestle Stage Marking, Drilling & Tapping Of Holes Wherever Necessary. Marking & Placing Of Detail Items. Complete Welding Wherever Necessary. Weld Parameters To Bechecked & Recorded Assembly & Welding Oftrough Sheets. Dimensional & Visual Checks. Punching Of Serial No & Ensuringproper Traceability. D Surface Preparation And Painting Stage. Short/sandblast To The Requirements. Painting Process As Per The Specification. Visualinspection. Final Product Inspection. Note: Application Of Aluminium Weldingcoat To Rcf Spec Mdts 28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoidbi-metalliccorrosion.[safety Item ]

Integral Coach Factory
ID GTS-1524027
Estimated Value
Refer Document
Closing Date
23 Sep 2026
3 Days Left
Location
TAMIL NADU
CHENNAI
Overview
Supply Of Under Frame Complete For Vbs/ndtc/cb To Drg No A09 11001, Alt 'nil'. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.02. For Painting Note 1.2 Of Drg No (538)lwlrrm-1-1-116, Alt 'e' To Be Followed---- Special Condition : The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down.- Packing To Be As Per Icf/j&t/misc-2487, Alt 'b' "there Will Be Minor Modifications In Design. Frim Shall Obtain The Final Drawings Before Manufacturing". Details For Satge Inspection. A Raw Material Stage Ensure The Raw Material Used Usingportable Spectrometer B Jig Stage Assembly Of Front Part With Solebar. Assembly Of Modular Frame Arrangement. Weld Parameters To Be Checked & Recorded C Trestle Stage Marking, Drilling & Tapping Of Holes Wherever Necessary. Marking & Placing Of Detail Items. Complete Welding Wherever Necessary. Weld Parameters To Bechecked & Recorded Assembly & Welding Oftrough Sheets. Dimensional & Visual Checks. Punching Of Serial No & Ensuringproper Traceability. D Surface Preparation And Painting Stage. Short/sandblast To The Requirements. Painting Process As Per The Specification. Visualinspection. Final Product Inspection. Note: Application Of Aluminium Weldingcoat To Rcf Spec Mdts 28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoidbi-metalliccorrosion.[safety Item ] Delivery/work location: Chennai, Tamil Nadu. This is a Open tender. Bid closing date: 23-09-2026.
Tender Information
Tender No GTS-1524027 Tender Type Open
Contract Type Buy Category Buy
Offer Validity EMD Required ₹0
Document Cost ₹0 Submission Time 14:15:00
Timeline
Published
15 Aug 2026
Bid Closing
23 Sep 2026
14:15:00
Issuing Authority
Organisation
Integral Coach Factory
Department ID
18
TAMIL NADU , CHENNAI
Fees & EMD
EMD Amount ₹0
Tender Fee ₹0
Offer Validity
🔒

Get Document Access

Fill in your details — we'll contact you within 12 hours

📄 Tender Document Request

🔒 Free · No spam · Response within 12 hours

— or —
Already have an account? Login to access instantly