GTS-410680 ACTIVE BUY

Supply Of Underframe Complete For Lwlrrm Amrit Bharat Coaches To Drg. No.lp11103,alt D, Anx 9 Without Item 30 To Drg. No.1.11012.0.03.095.001 With Additional Brackets To Drg No 53811115, Alt 'a'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev-02 With Amendment No.'02'. Special Condition : The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Packing Condition As Per Drg No. Icf/j&t/misc-2487, Alt 'b'. Stage Inspection Details. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion.[safety Item ]

Integral Coach Factory
ID GTS-410680
Estimated Value
Refer Document
Closing Date
09 Jul 2026
17 Days Left
Location
TAMIL NADU
CHENNAI
Overview
Supply Of Underframe Complete For Lwlrrm Amrit Bharat Coaches To Drg. No.lp11103,alt D, Anx 9 Without Item 30 To Drg. No.1.11012.0.03.095.001 With Additional Brackets To Drg No 53811115, Alt 'a'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev-02 With Amendment No.'02'. Special Condition : The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Packing Condition As Per Drg No. Icf/j&t/misc-2487, Alt 'b'. Stage Inspection Details. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion.[safety Item ] Delivery/work location: Chennai, Tamil Nadu. This is a Open tender. Bid closing date: 09-07-2026.
Tender Information
Tender No GTS-410680 Tender Type Open
Contract Type Buy Category Buy
Offer Validity EMD Required ₹0
Document Cost ₹0 Submission Time 14:15:00
Timeline
Published
09 Jun 2026
Bid Closing
09 Jul 2026
14:15:00
Issuing Authority
Organisation
Integral Coach Factory
Department ID
18
TAMIL NADU , CHENNAI
Fees & EMD
EMD Amount ₹0
Tender Fee ₹0
Offer Validity
🔒

Get Document Access

Fill in your details — we'll contact you within 12 hours

📄 Tender Document Request

🔒 Free · No spam · Response within 12 hours

— or —
Already have an account? Login to access instantly