GTS-502289 ACTIVE BUY

Supply Of Under Frame Arrgt For Memu/dmc/3ph To Drg No. 74511059, Alt 'c' Col 1. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing Condition As Per Drg No Icf/j&t/misc-2487 Alt 'b'. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]

Integral Coach Factory
ID GTS-502289
Estimated Value
Refer Document
Closing Date
09 Jul 2026
14 Days Left
Location
TAMIL NADU
CHENNAI
Overview
Supply Of Under Frame Arrgt For Memu/dmc/3ph To Drg No. 74511059, Alt 'c' Col 1. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing Condition As Per Drg No Icf/j&t/misc-2487 Alt 'b'. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ] Delivery/work location: Chennai, Tamil Nadu. This is a Open tender. Bid closing date: 09-07-2026.
Tender Information
Tender No GTS-502289 Tender Type Open
Contract Type Buy Category Buy
Offer Validity EMD Required ₹0
Document Cost ₹0 Submission Time 14:15:00
Timeline
Published
09 Jun 2026
Bid Closing
09 Jul 2026
14:15:00
Issuing Authority
Organisation
Integral Coach Factory
Department ID
18
TAMIL NADU , CHENNAI
Fees & EMD
EMD Amount ₹0
Tender Fee ₹0
Offer Validity
🔒

Get Document Access

Fill in your details — we'll contact you within 12 hours

📄 Tender Document Request

🔒 Free · No spam · Response within 12 hours

— or —
Already have an account? Login to access instantly