GTS-630109 ACTIVE BUY

Supply Of Set Of Welded Partition Frame For Non Ac Bangladesh Coach. Note: Make/manufacturer Of Raw Material Shall Be M/s Jsl Or M/s Sail., As Per Drawing: Mp25parnabang Version 3, Packing Instruction: `packing Condition Of Set Of Partition Frame And Procedure To Achieve Best Possible Protection During Transportation: 1. Surface Preparation: - Thoroughly Clean The Components To Remove Any Dirt, Grease Or Contaminants - Apply A Protective Film, Such As Pvc Or Laser Film Or Bubble Sheet, To Shield Surfaces From Scratches And Environmental Factor. 2. Packing Materials: - Wooden Crates: Construct Sturdy Wooden Cage Tailored To The Component's Dimensions. - Steel Strapping: Utilize Rust-proof Steel Straps To Securely Bundle Components, Preventing Movement During Transit. 3. Moisture Barrier: - Incorporate Moisture-proof Materials, Such As Plastic Film Or Water Proof Ability Paper, To Guard Against Corrosion. 4. Component Arrangement: - Place Components On Wooden Pallets Or Within Custom-designed Supports To Distribute Weight Evenly And Prevent Deformation. - Ensure That No Part Of The Component Extends Beyond The Protective Packaging To Avoid Exposure To Potential Damage. 5. Securingthe Components: - Use Steel Straps Or Ropes To Fimly Anchor The Components Within Thewooden Crate, Minimizing Internal Movement. - For Added Stability, Employ Bracing Or Cushioning Materials, Such As Foam Pads Or Corrugated Inserts, To Fill Voids And Absorbshocks. - Hardware Items To Be Suitably Packed Separately Inside The Crate. 6. Labeling And Documentation: - Clearly Label Each Package With Essential Information, Including Pl No. Specifications, Details Of Each Set With Qty. And Also Keep One Copy Inside Ot The Crate, Weight, Handling Instructions And Firm's & Destination Details. 7. Loading Onto Trailer/lorry/truck/transport: - Strategically Position The Packaged Components Within The Truck/suitable To Maintain Balance And Prevent Shifting During Transit. - Secure The Packages To The Container's Structure Using Lashing Ties Or Additional Bracing As Needed. 8. Final Inspection And Sealing: - Conduct A Thorough Inspection To Verify Thatall Components Are Securely Packed And That Packaging Materials Are Intact. [ Warranty Period: 30 Months After The Date Of Delivery ]

Rail Coach Factory
ID GTS-630109
Estimated Value
Refer Document
Closing Date
02 Jul 2026
4 Days Left
Location
MULTI STATE
MULTI CITY
Overview
Supply Of Set Of Welded Partition Frame For Non Ac Bangladesh Coach. Note: Make/manufacturer Of Raw Material Shall Be M/s Jsl Or M/s Sail., As Per Drawing: Mp25parnabang Version 3, Packing Instruction: `packing Condition Of Set Of Partition Frame And Procedure To Achieve Best Possible Protection During Transportation: 1. Surface Preparation: - Thoroughly Clean The Components To Remove Any Dirt, Grease Or Contaminants - Apply A Protective Film, Such As Pvc Or Laser Film Or Bubble Sheet, To Shield Surfaces From Scratches And Environmental Factor. 2. Packing Materials: - Wooden Crates: Construct Sturdy Wooden Cage Tailored To The Component's Dimensions. - Steel Strapping: Utilize Rust-proof Steel Straps To Securely Bundle Components, Preventing Movement During Transit. 3. Moisture Barrier: - Incorporate Moisture-proof Materials, Such As Plastic Film Or Water Proof Ability Paper, To Guard Against Corrosion. 4. Component Arrangement: - Place Components On Wooden Pallets Or Within Custom-designed Supports To Distribute Weight Evenly And Prevent Deformation. - Ensure That No Part Of The Component Extends Beyond The Protective Packaging To Avoid Exposure To Potential Damage. 5. Securingthe Components: - Use Steel Straps Or Ropes To Fimly Anchor The Components Within Thewooden Crate, Minimizing Internal Movement. - For Added Stability, Employ Bracing Or Cushioning Materials, Such As Foam Pads Or Corrugated Inserts, To Fill Voids And Absorbshocks. - Hardware Items To Be Suitably Packed Separately Inside The Crate. 6. Labeling And Documentation: - Clearly Label Each Package With Essential Information, Including Pl No. Specifications, Details Of Each Set With Qty. And Also Keep One Copy Inside Ot The Crate, Weight, Handling Instructions And Firm's & Destination Details. 7. Loading Onto Trailer/lorry/truck/transport: - Strategically Position The Packaged Components Within The Truck/suitable To Maintain Balance And Prevent Shifting During Transit. - Secure The Packages To The Container's Structure Using Lashing Ties Or Additional Bracing As Needed. 8. Final Inspection And Sealing: - Conduct A Thorough Inspection To Verify Thatall Components Are Securely Packed And That Packaging Materials Are Intact. [ Warranty Period: 30 Months After The Date Of Delivery ] This is a Limited tender. Bid closing date: 02-07-2026.
Tender Information
Tender No GTS-630109 Tender Type Limited
Contract Type Buy Category Buy
Offer Validity EMD Required ₹0
Document Cost ₹0 Submission Time 11:30:00
Timeline
Published
22 Jun 2026
Bid Closing
02 Jul 2026
11:30:00
Issuing Authority
Organisation
Rail Coach Factory
Department ID
240
MULTI STATE
Fees & EMD
EMD Amount ₹0
Tender Fee ₹0
Offer Validity
🔒

Get Document Access

Fill in your details — we'll contact you within 12 hours

📄 Tender Document Request

🔒 Free · No spam · Response within 12 hours

— or —
Already have an account? Login to access instantly